View-only copy · last updated November 11, 2026, 3:24 PM UTC · changes made here are not saved
Site Operations Board

Continental Services · Site Operations

Weekly Hours — WE 09/12/2026

From Connecteam timeclock + operations log
Loading…

Overview

The whole board at a glance. Click a number or a chart to jump to the detail behind it.

Hours by site

Hours clocked against allowance; the tick marks the allowance. Click a site to open it.

Weekly hours

Hours clocked each week. The tick marks that week’s total allowance. Click a week to open it.

Margin by contract

Supplies by month

What we ordered each month. Click a month to open it in Supplies.

Reports

Open entries by type, straight from Connecteam. NEW marks reports that came in during the last 3 days. Click one to open it.

Or jump to week ending

Actual vs. allowance — by site

The tick marks each site\u2019s allowance and the fill is the hours clocked, overtime hours included. A bar that stops short of the tick is under its allowance; a bar that runs past it is over.

Employee detail, from the Connecteam timeclock export
EmployeeWorkedHoliday/PTOTotal paidScheduledVariance
Enter / update actual hours manuallyOptional. Hours already come from Connecteam automatically.

Actual hours entry

Format: Location name, hours worked — one per line. Names must match a site below exactly; unmatched lines are flagged, not dropped.

Flagged activity

Hours logged this week outside the standard site list.

No activity logged outside the standard site list this week.

Monthly comparison

Each week counts toward the month its Saturday falls in, the same way the WE dates are named. Pick months to compare and switch between month totals, weekly averages and share of allowance.

Compare by

Month by month

Every month on record. Click a bar to add or remove it from the comparison below.

Allowance versus actual

Compare months side by side

Quick pick

Weekly hours, week by week

Hover or tap a bar for the exact week.

Sites by month

Click a site to focus the whole tab on it.

Data table, all months
MonthData sourceWeeks countedTotal hoursWeekly averageWeekly allowance% of allowanceWeekly average vs previous

Operational Reports

Complaints, incidents, missing items, and broken items. Add entries below as they come in.

DateLocationReported byDescriptionStatus

Add complaint

Archive — previous weeks

Every completed week except the one currently active. Click a week to open its full site breakdown.

Employee Ratings

Combines logged inspection scores (1–5 stars) with a complaint severity tally.

Effective rating = inspection average, reduced by complaint severity (each Level-1 complaint −0.1, Level-2 −0.3, Level-3 −0.6, floored at 0). Complaint score starts at 0 and only rises as complaints are logged and tagged to an employee.

Log an inspection

Record the result of a site walkthrough or supervisor review.

Contract square footage

From the Contract Square Footage sheet. Edit any figure here and it saves for everyone. Leave a site blank when the footage is not on file. Add-on services (extra work in space we already clean for the landlord) have no footage of their own and are marked as such.

Square feet by contract

Click a bar to jump to that contract and edit its figure.

ContractSquare feetWeekly allowanceSq ft per allowed hourActual hoursSq ft per actual hour

Contract Builder

Price a new contract before you bid. Enter the square feet, how many people work in the space and the production rate. The density guide suggests a rate for you, and the crew cost and supplies come from your own payroll and supply orders.

The space

The work

The price

Price it by
StepAmountHow it is worked out

Supplies Calculator

What this space would use each month, from what the sites we clean really order.

Item listEvery supply, how much a month and what it costs.
ItemUnitPer monthPriceCost a month

Density guide

The more people in a space, the slower the cleaning (more desks, more trash, more restrooms). These are starting points. Change a number and it saves for everyone. Check them against the table below.

DensityPeople per 1,000 sq ft, up toProduction rate (sq ft per labor hour)

Compared with our current contracts

Sq ft per hour is each contract's square feet divided by its weekly allowance, scaled to the cleanings per week above. The charge is from the Master Sheet.

ContractSquare feetWeekly allowanceSq ft per labor hourCharge a monthPer 1,000 sq ft

Saved estimates

NameSquare feetPeoplePrice a monthMargin

Service Book

Each customer's billing history: what we charge per month, when it changed and why. Open a customer to see every change.

Supplies

What we spent on supplies, by supplier. An order counts in the month it was ordered, even if it shipped or was invoiced later, and a backorder stays in the month of its original order. Each company we buy from gets its own column.

Supplies

Spend by month

Click a month to filter everything on this page. Click it again to clear.

Spend by ship address

Click an address to filter. Hover for the order count.

Top items by spend

Click an item to find it in the item list below.

Every month, by supplier

Supplies ordered each month, with one column for each company we order from. Add another supplier and its column appears.

By ship address

Each order sits under the Ship Street Address shown on the supplier’s order history or receipt (RMAC and Staples). To move an order, pick another ship address in the order list below. The tag says whether the address is a contract on the Master Sheet.

Ship addressSupplierOrdersSuppliesEquipmentTotal

What was bought

Supplies by location

Every supply bought for each ship address: name, quantity and amount, for the month, supplier and ship address chosen above. Equipment is left out unless you tick the box. Tap an address to open or close its items.

Ship addressItemQtyUnitAvg priceAmount

How much supply a floor area needs

Built from what each ship address actually ordered, divided by its square feet and by the months loaded. Equipment and the unexplained $25.00 charges are left out. Enter square feet for any address that has none and it joins the estimate.

Ship addressSquare feetWhere it comes fromSuppliesPer monthPer 1,000 sq ft a monthIn the estimate
ItemUnitQty neededOrder (whole units)PriceEst. cost

Orders

One row for each shipment. Open Items to see every product and its price.

OrderedOrderSupplierShip addressAmountStill owed
Price listEvery product bought in this view, with the price paid and any price change.
SupplierProduct #ItemUnitQtyPricePrice historySpend
Checks on the screenshotsWhich screenshots were loaded, left out or counted once, and what to confirm.
View

Billing versus payroll

For each contract, for the month: what we billed, what the crew cost us, and the profit. Payroll is paid weekly and billing is monthly, so each month adds up the pay weeks paid in it (by pay date) and compares that with the monthly charge.

Payroll

Each contract

Billed is the contract's monthly charge. Crew pay + taxes is the weekly payroll added up for the month, plus the payroll taxes the company pays on it. Profit is billed minus crew pay + taxes. Employees who no longer work here are listed under the contract they were paid on, with what they were actually paid in the pay weeks loaded. Type the number of each month’s invoice in the last column once it goes out; it is saved for that contract and month.

ContractBilledCrew pay + taxesProfitMarginInvoice #
Details by contractWages, employer taxes, the margin the Master Sheet planned, clocked hours and cost per hour.
ContractBilledWagesEmployer taxesUnassigned shareCrew pay + taxesProfitMarginPlanvs planHoursCost / hr

Plan is the margin the Master Sheet expected: its monthly profit as a share of its monthly charge. Hours are clocked hours from Connecteam for the same pay weeks.

Margin at or above planMargin below planPlanned margin
Every payroll line in the fileThe pay weeks loaded for this month, exactly as printed in the payroll file, so the totals can be checked.
Payroll lineWhat it isWagesEmployer taxesTotal

Allowance thresholds

Edit any site's weekly hours allowance — updates apply to every week.